September 19, 2024

Greetings,

It was a busy this morning at the lighthouse. Mike LeClair and his Baylake Electric crew arrived at the lighthouse at 0630 to finish up on the next round of electrical work. LED strip lighting was installed in all basement rooms including the tower basement. A receptacle was also installed in the tower basement.

Two duplex receptacles were installed in the kitchen, each on separate circuit breakers. We should have no problem running an electric heater in the kitchen. A receptacle was installed in the main basement room and another on the outside of the lighthouse. They did a great job.

No more need for the Jackery and solar panel for daily operations. Now it can be used on the second floor during twilight tours.

It was good to see Josh Hood back today to finish up some odds and ends.

Ed

Leave a Comment

Your email address will not be published. Required fields are marked *