September 4, 2024
Greetings! Chuck got new drain tile and reconnected the drain tiles that were severed when the contractor was trenching for the connection at the meter pedestal on the lighthouse. We […]
Greetings! Chuck got new drain tile and reconnected the drain tiles that were severed when the contractor was trenching for the connection at the meter pedestal on the lighthouse. We […]
Greetings! Chuck Baum our lighthouse engineer has been working on the shutters to make life easier for the folks who have to open and close them. If you’ve volunteered at
All About Shutters Read More »
Greetings! Today was an eventful morning at the lighthouse. The WPS contractor arrived early to cut a trench across the road to route the high voltage power feed to the
Greetings! The WPS contractor is getting ever closer to the connection point for our power feed at Welker’s Point campground. They are probably within about two-tenths of a mile before
Greetings! The trencher was back on site today. When I got there at 1:00 p.m. they were done with active trenching for the day. They were doing cleanup work along
Greetings, The saga of getting electricity to Eagle Bluff Light Station continues. However, we are making progress and power is about to become a reality. After 156 years EBLH will
August 6, 2024 Greetings! The Phase One, initial stabilization, work pretty much wrapped up this morning. Foundation parging painting is done along with painting of the stone window sills. We
August 5, 2024 Greetings, It was an eventful day at the lighthouse as the initial stabilization work draws to a close. John Fletcher and his son Tyler visited the lighthouse
August 1, 2024 Greetings! Josh and Dion are getting close to wrapping up the immediate stabilization work for Eagle Bluff Light Station. Next week will probably be their last week
Greetings! It was remarkable day at the lighthouse. The first order of business was reinstalling the screen in the inlet of the vent ball in the lantern room. This needed