From the Keeper’s Desk – June 2
Greetings! Lots of different things happened today. Josh and Deion did a lot of grinding out bad mortar on the privy and oil house ahead of tuck pointing. Billy and […]
From the Keeper’s Desk – June 2 Read More »
Greetings! Lots of different things happened today. Josh and Deion did a lot of grinding out bad mortar on the privy and oil house ahead of tuck pointing. Billy and […]
From the Keeper’s Desk – June 2 Read More »
Greetings! The inside of the tower looks great after Josh and Deion put on a second coat of paint. Billy and Mike continue to work on roof trim. Frankie keeps
From the Keeper’s Desk – May 28 Read More »
Greetings! Today was one of those days with the devil in the details when Mike and Billy were installing roof trim. Chuck painted the trim on the small summer kitchen
From the Keeper’s Desk – May 27 Read More »
Greetings, Deanna, John and I painted siding for the Summer Kitchen with solid color white stain. We had a good start last Thursday and almost finished this morning before we
From the Keeper’s Desk – May 26 Read More »
Greetings! Eagle Bluff Light Station opened for the season today. Eric Peterson from WLUK TV in Green Bay visited this morning and did a terrific feature that aired today and
From the Keeper’s Desk – May 23 Read More »
Greetings! There’s never a dull moment the light station this week. The cupola is on the roof. It is temporarily weather tight. It still needs louvers and some trim. Deanna,
From the Keeper’s Desk – May 22 Read More »
Greetings! There is never a dull day at Eagle Bluff Light. Frankie has electrical boxes installed and wire pulled in the summer kitchen. Masons Zak and Jordan arrived to build
From the Keeper’s Desk – May 21 Read More »
Greetings! More progress at Eagle Bluff Light. It was not the nicest of days weather wise. We were going to start applying solid color stain to the summer kitchen siding.
From the Keeper’s Desk – May 20 Read More »
Greetings! It was an action packed day at the light station. Staff and volunteers were on hand to prepare the lighthouse for opening day Friday May 23. Cannot say enough
From the Keeper’s Desk – May 19 Read More »
Greetings! Made good progress today. Trenching started for the underground electrical conduit connection from the barn to the lighthouse. The lighthouse is now fully wrapped and protected from rain (like
From the Keeper’s Desk – May 15 Read More »